MYLES PEÑA —  WORK  —  ABOUT  —   CV  —  CONTACT

EB5 Private School Campus︎
Phased Predesign


Bothell, Washington
Completed at NAC Architecture
100,000sf
2017  



Predesign was conducted as part of a feasibility study for a new partnership between an EB5 client and a prestigious private school. The program was to be conducted over six phases and included a large student housing facility on site. 





Phasing Diagram



  Email   -  LinkedIn  -  Instagram         © 2022 Myles Peña / Seattle, WA